SUNDHARI, BAYU WURYANING (2015) ANALISIS KINERJA SUPPLY CHAIN DENGAN METODE SUPPLY CHAIN OPERATION REFERENCE (SCOR) (Studi Kasus : CV. SABDA ALAM ABADI I). Skripsi thesis, Universitas Setia Budi Surakarta.
Text
JUDUL - BAB I.pdf Download (558kB) |
|
Text
INTISARI.pdf Download (88kB) |
|
Text
BAB II.pdf Restricted to Repository staff only Download (8MB) | Request a copy |
|
Text
BAB III.pdf Restricted to Repository staff only Download (92kB) | Request a copy |
|
Text
BAB IV.pdf Restricted to Repository staff only Download (390kB) | Request a copy |
|
Text
BAB V.pdf Download (924kB) |
Abstract
CV. SABDA ALAM ABADI I is a company engaged in especially garmen. This company has applied the concept of supply chain from raw material supply by suppliers to finished products into the hands of consumers. But in its company implementations, it has often trouble in optimalizing workforce planning so that sometimes the company can not fulfill customers demand. It is evident that in August and September, the company can not meet the order of 200 pcs shirt. For that reason, company needs to supply chain performance measurement to determine the extent to which performance of the company's supply chain has been achieved with optimal workforce planning to meet customer demand. From the results of research by the method of SCOR in the make process level I, it is earned value metrics Perfect Order Fulfillment (POF) by 100%, Order Fulfillment Cycle Time (OFCT) for 21 days, Cost of Good Sold (COGS) Rp 11,009,043,505.00; and Cash-to-Cash Cycle Time (CTCCT) for 129.08 days with labor 40 / line. Then, on the third level SCOR processes mapped inputs, processes and outputs of the problems in the manufacturing process (make) that is due to a lack of labor in the production process which led to the company can not fulfill orders from customers. Keywords-workforce planning, performance measurement, supply chain, SCOR
Item Type: | Thesis (Skripsi) |
---|---|
Uncontrolled Keywords: | orkforce planning, performance measurement, supply chain, SCOR |
Subjects: | T Technology > TS Manufactures |
Divisions: | Fakultas Teknik > Prodi S1 Teknik Industri |
Depositing User: | magdalena kartika ningsih |
Date Deposited: | 21 Feb 2020 01:15 |
Last Modified: | 21 Feb 2020 01:15 |
URI: | http://repo.setiabudi.ac.id/id/eprint/2189 |
Actions (login required)
View Item |