ANALISIS BEBAN KERJA FISIK DAN MENTAL PADA OPERATOR LANTAI PRODUKSI DENGAN METODE CARDIOVASCULAR LOAD (%CVL) DAN NATIONAL AERONAUTICS and SPACE ADMINISTRATION TASK LOAD INDEX (NASA-TLX) (Studi Kasus di PT. Poly Meditra Indonesia)

WIBOWO, BAGAS ANDI (2019) ANALISIS BEBAN KERJA FISIK DAN MENTAL PADA OPERATOR LANTAI PRODUKSI DENGAN METODE CARDIOVASCULAR LOAD (%CVL) DAN NATIONAL AERONAUTICS and SPACE ADMINISTRATION TASK LOAD INDEX (NASA-TLX) (Studi Kasus di PT. Poly Meditra Indonesia). Skripsi thesis, Universitas Setia Budi Surakarta.

[img] Text
BAB I.pdf

Download (433kB)
[img] Text
BAB II.pdf
Restricted to Repository staff only

Download (389kB) | Request a copy
[img] Text
BAB III.pdf
Restricted to Repository staff only

Download (80kB) | Request a copy
[img] Text
BAB IV.pdf
Restricted to Repository staff only

Download (601kB) | Request a copy
[img] Text
BAB V.pdf

Download (313kB)
[img] Text
INTISARI_ABSTRACT.pdf

Download (80kB)
[img] Text
LEMBAR PERNYATAAN PERSETUJUAN PUBLIKASI.pdf

Download (172kB)

Abstract

Employee productivity is one of the important things that need to be considered by a company, especially for manufacturing companies where most of the production process is carried out by humans. The benchmark in employee productivity is workload. High physical and mental workload will decrease in worker productivity. PT. Poly Meditra Indonesia is a company engaged in the field of snacks such as biscuits, sweets and snacks "Taro" which is located in the industrial area of the district of Jaten, on Jl. Solo-Tawangmangu Km 9, Jumok, Jaten, Karanganyar 57731. Focus of this research is on the operator of the taro snack production at morning works and afternoon works. This research applies the Cardiovascular Load (% CVL) method and the National Aeronautics and Space Administration Task Load Index (NASA-TLX) method. The results of the study showed that there was an average CVL of physical workload in the morning work that was 22.76% and kerja siang sebesar 24.57%, the average mental workload score for morning work is 75.11 and afternoon work is 71.17 Keywords: Workload, Physical Workload, Mental Workload, Cardiovascular Load, NASA-TLX.

Item Type: Thesis (Skripsi)
Uncontrolled Keywords: Workload, Physical Workload, Mental Workload, Cardiovascular Load, NASA-TLX.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Prodi S1 Teknik Industri
Depositing User: Mrs NOVI HANDAYANI
Date Deposited: 01 Nov 2019 03:36
Last Modified: 01 Nov 2019 03:36
URI: http://repo.setiabudi.ac.id/id/eprint/3612

Actions (login required)

View Item View Item